Entrance Door
Payment & Shipping Terms:
| Minimum Order Quantity: | value= |
|---|---|
| Payment Terms: | L/C,T/T,T/T,Western Union,MoneyGram |
Detailed Product Description
Entrance Door, iron door, wrought iron door
Iron products have strict manufacture processes in designs, material selection and manufacture craft
Design: in charge of our full-experiment designer-Lion Ren, who has been in this field for 15yearr 15years and held the position of design director of a Hong Kong co Kong company &ompany
Material selection: we select high grade fine steel (P less than 0.035 percent,S less than 0.030 percent)cold drawn steel which is in line with ISO9001 international standard. Each steel material is strict selected with the surface neat and smooth, the separation angleon angle should be no less than 45 degrees between cross rib and steel bar surface, thface, the surface should not cra not cra not crack at the bend parts after bent 180 degrees flexura flexural cexural cexural centre diameter, and steel bar surface should not crack , scar , scar over or cver or collapse.
lt;p>Ft;p>Forging Technology: to force presrce pressure on the planchet by the metal forming machinery (air forgair forgair forging hammer and mechanical press ) so as to make it plastic deformation to achieve the certain forgeable pieces in different shape or size. Processes as below:
Forging stock blanking, forging stock heating, roll forging for blank, stamp forging to certain shape, trimming cut, intermediate inspection, inspec, inspection of the sizethe size and surface blemish of the fof the fof the forging pieces. Forging heat-treatment to remove forging stress and improve metal machinability ; sweeping is used to wipe surface surface oxidation; the exterior appearance and hardness should be checked commonly
Welding Technology: our lofting master draw the same picture as the design in 1:1 proportion with the product. Our past master jointing worker then weld the iron products already bent to shape all together. The product should be level, straight, smooth, and the arch should be smooth, and without twist, and the flower mould should be smooth with the jointing has to be artistic and firm. The welding line must be neat and eat and firm. Flower mould must be in proportion with the sth the same model numodel number should be the same and coincide completely. Aetely. Any workpiece cut by plasma cutting or not easy to polish must be polished before gang welding. Accessory pieces must be forged or polished before bent in shape, then welded with main iron art structure. Any burr occurred aftrred after forged mforged must be polished before bending. The grad distance must be less than 110mm by any gate, railing, staircase, handrail or iron window without any declare of special demands as per safety standards. Sample plate must be made to be confirmed before large batch production. The size and jointing tenting tecting technologychnology of iroy of iron airon art products should be tested by quality inspector. Manufacture size and the size required by design are allowed to make to make a dmake a deviation of 1:1000 according to different products.
&;/p>Ht;p>Ht;p&g;p&g;p>Hot galvanize technology: every : every piece can be welded all together should be welded before hot galvanize and it is not allowed to weld after hot galvanize without any special situation. For hot galvanize products, weep hole should be opened from the private position of the tube to ensure ainsure air flow smooth for molten Zinc and acid wash. To pre. To prevent the sealing of the gate go out of shape, the sealing must be welded after hot galvanize. All products should open up an angle, the two angles welded together inether in stead of welding directly.irectly. The thickness of cold galvanizing layer is 5-15um, can keep the produhe product out of rust for more than 2 years. But hot galvanize technology, the best of allt of all in this fi this field, iron art decoration products are put into about 455 degrees Zinc bath witbath with Zinc rare earth alloy and billet aluminum, is used by our Shou Jee iron art decoration corporation. The on. The thickhe thickness of the hot galvanize layer is above 65μm, even come up to 100μm. The advantages of hot galvanize is that it has good coverod covering power, dense galvanize laynize layer and without any organic matter. The weather-resistant mechanism of Zinc includes mechanical protection and electrochemical protection: the surface of hot of hot galvanize layer has ZnO, Zn(OH)2 , ZnCO3-2Zn(OH)2-H2O in atmospheric corrosion condition, which slow down the run the rusty of Zinc to a certo a certain extent. This protective layer called white rust can form a new layer while destroy destroyed. Weather-resistant power to base to base metallic iron of hot galvanize technology is much is much better than thathan that of cold galvanizing, and hot galvanizing can keep the produhe products out of rust over 50 years.
<>Painting technology: gllogy: gloss of the painting divided intoded into: light, matte, matte, semi-matte, light divided into: touches, semiflat, dead luster. The brighter thehter the pai the paintings are, the more ageing-resistant they are. The drying functions are divided into surface drying and hng and hard drying wdrying wdrying withing with suitable moisture of 65 percent. Eacent. Each kind of painting makting makes different drying time, t time, to ensure tensure the ure the strength of adhesive force and to make it look the same as new, we control the drying time of following:
lt;p>Nitr;gt;Nitryl lacquer basic painting surface drying drying time is 0.2 hour, hard dry time is 1 hour
Bi-component epoxy primoxy primer painting surface dface drying time is 0.5 hour, hard dry time is 24 hours
Bi-component epoxy zinc rich primer painting surface drying time is 0.5 hour, hard dry time is 8 to 10 hours
<>Acrylic dilute acid air dry painting surface drying time is 0.me is 0.5 hour, hard dry timedry time is 4 hours
t;/p>Bi-component acrylic finish coat surface drying time is 0.5 hour, hard dry time is 8hours
Alcohol acid gulf red finish coat surface drying time ng time is 2 hour, hard dry time is 24 hours
Red lead gulf red finish coat surface drying time is 4 hour, hard dry time is 24 hours
Entrance Door
Other Products from this Supplier
Product Showcase[10]
Products
- Hydraulic valve [1]
- Fencing & Edging [1]
- furniture [1]
- copper art [7]
- iron canopies [16]
- driveway gate [41]
- Entrance Door [58]
- Fencing & Edging [14]
- window [20]
- wrought iron balcony [43]
- wrought iron staircase [22]
Company Info
Guangzhou Suji Iron Art Decoration Business Department
[China (Mainland)]
[Verified Member]
City: Guangzhou
Province/State: Guangdong
Country/Region : China (Mainland)
Business Type:Manufacturer, Distributor/Wholesaler
Online Postings: Products

















































